Problem
Çöpler Gold Mine located in the province of Erzincan, needed a 20m high retaining wall for the grinder area to be formed on a terrace on the slope of a hill. It was also necessary to construct a retaining structure for the crusher wall having a height of 14m which would allow the ore to be dumped into the crusher brought by trucks from the open pit mine.
An economic and flexible retaining structure is required to withstand the strains and loads from the height of the grinder wall and the trucks weighing 40-60 tonnes feeding the crusher with the ore.
Solution
The traditional concrete systems that are common in the mine fields are rigid structures. Due to continious high vibrations, cracks occur in the concrete structures.
These structures that cannot adopt to the changing environmental conditions are replaced with geogrid reinforced retaining structures which are environmentally friendly, flexible and techologically new products. For this reason, Anagold has decided to use systems that were developed by Maccaferri, the leader in the mining field for such solutions.
After calculating the overturning, sliding, internal and external stability analysis with MacStars-W, a software that can analyse the interaction of geogrids with gabion baskets, Maccaferri had decided that the most appropriate retaining structure is the Terramesh System reinforced with ParaLink geogrids.
In pratice, a backfill material of crushed stone having a maximum particle size of 76mm known as structural fill, has been laid and compacted in layer thicknesses of 25-33cm. After the calculations it has been determined that ParaLink 300kN and 200kN geogrids shall be installed with a 1m vertical spacing at the bottom and 2m vertical spacing on top of the walls. The 20m high grinder and 14m high crusher walls having a total surface area of 4685m2 was constructed in 4 months.
Client and Main Contractor | ANAGOLD MINENING |
Project Design | MACCAFERRİ |
Products Used | TERRAMESH SYSTEM AND PARALINK |
Date of Construction | 2016 |
We will let you know about the latest news!
In the 19th century, we invented Gabions and dramatically changed civil engineering’s landscape. We are still changing it today. We work everyday, with 140 years of our history, to find better solutions for our clients at every degree of latitude and longitude. We make innovation happen around the world, we share our knowledge capital to multiply the return on investment of clients and partners, and we offer ongoing support to establish relations built on solid trust. This is us: Maccaferri.
Sahrayıcedid Mahallesi Atatürk Caddesi Kaptan Metin İş Merkezi No: 51 Kat: 4 Daire:3 34734
Kadıköy – İstanbul